by ARA | Mar 6, 2024 | Uncategorized
Singapore PSC Scorecard – CY2023 This RISK4SEA Report about PSC inspections in Singapore for 2023 includes the Singapore vs Tokyo MoU Detention rate per segment, the Top 20 Detainable Deficiency Codes Ranking and some important PSC Highlights. Key PSC Figures Key...
by ARA | Feb 19, 2024 | Uncategorized
Global PSC Detentions – CY2023 This RISK4SEA Report about PSC Detentions globally for 2023 includes global key PSC Figures and global Key Performance Indicators (KPIs), the Most Common Detainable Deficiency and the Ports with most Inspections per Fleet Segment....
by ARA | Jan 18, 2024 | Uncategorized
Port Hedland PSC Highlights Capesize L36M (Dec. 2020 – Nov. 2023) This RISK4SEA Report about PSC inspections Highlights for Capesize in Port Hedland for the last 36 months (Dec. 2020 – Nov. 2023) includes Unique inspections vs Unique calls & Re-inspections, the...
by ARA | Dec 20, 2023 | Uncategorized
Novorossiysk PSC Scorecard L36M (Nov. 2020 – Oct. 2023) This RISK4SEA Report about PSC inspections in Novorossiysk for the last 36 months (Nov. 2020 – Oct. 2023) includes Novorossiysk vs Black Sea MoU Detention Rate (DER) and the most common detainable deficiencies...
by Stavroula | Dec 19, 2023 | Uncategorized
Final results and Fire Safety CiC intensity Index (September-November Data) A joint Concentrated Inspection Campaign (CiC) has been launched during autumn for Fire Safety compliance under the following regimes Paris Memorandum of Understanding (Paris MoU) Tokyo...
by Stavroula | Nov 30, 2023 | Uncategorized
Preliminary results and Fire Safety CiC intensity Index (September-October Data) A joint Concentrated Inspection Campaign (CiC) was launched during autumn for Fire Safety compliance under the following regimes Paris Memorandum of Understanding (Paris MoU) Tokyo...