Insights
Port Hedland PSC Highlights Capesize L36M (Dec. 2020 – Nov. 2023)
This RISK4SEA Report about PSC Inspections Highlights for Capesize in Port Hedland for the last 36 months (Dec. 2020 – Nov. 2023) includes Unique inspections vs Unique calls & Re-inspections, the Port Hedland deficiency code profile and a PSC highlight about a Capesize vessel along with Key findings.
Novorossiysk PSC Scorecard L36M (Nov. 2020 – Oct. 2023)
This RISK4SEA Report about PSC inspections in Novorossiysk for the last 36 months (Nov. 2020 – Oct. 2023) includes Novorossiysk vs Black Sea MoU Detention Rate (DER) and the most common detainable deficiencies per fleet segment.
Final results and Fire Safety CiC intensity Index (September-November Data)
The Concentrated Inspection Campaign (CiC), lasting from 1st September 2023 to 30th November 2023 aimed to verify compliance with the Fire Safety implementation on board ships. RISK4SEA provides final results and intensity Index for the entire CiC period.
Preliminary results and Fire Safety CiC intensity Index (September-October Data)
The Concentrated Inspection Campaign (CiC), lasting from 1st September 2023 to 30th November 2023. aims to verify compliance with the Fire Safety implementation on board ships. RISK4SEA provides preliminary results and intensity Index for September – October Data.
Preliminary results and Fire Safety CiC intensity Index (September Data)
The Concentrated Inspection Campaign (CiC), lasting from 1st September 2023 to 30th November 2023. aims to verify compliance with the Fire Safety implementation on board ships. RISK4SEA provides preliminary results and intensity Index for September Data.
Australia PSC Scorecard L36M (Oct. 2020 – Sep. 2023)
This RISK4SEA Report about PSC inspections in Australia for the last 6 months (Oct. 2020 – Sep. 2023) includes Australia vs Tokyo MoU Detention Rate (DER) and the most common detainable deficiencies per fleet segment.
Primary PSC KPIs (DPI/DER) for YTD 2023 (JAN 23-SEP 23)
RISK4SEA is announcing the Primary Port State Control Key Performance Indicators (PSC KPIs) for the period of January to September 2023 with the objective to illuminate PSC performance across the major PSC regimes.
China PSC Scorecard L36M (Sep. 2020 – Aug. 2023)
This RISK4SEA Report about PSC inspections in China for the last 6 months (Sep. 2020 – Aug. 2023) includes China vs Tokyo MoU Detention Rate (DER) and the most common detainable deficiencies per fleet segment.