Paris MoU PSC Scorecard 2018
This RISK4SEA Report about PSC inspections in Paris MoU for 2018 includes ship type & age analysis, detention rate vs ship age, detentions analysis per operator base, ports with more than 10 detentions and detainable deficiency categories breakdown.
Key figures
MoU KPIs
Ship type & age analysis
Detention rate vs ship age (All ships)
Detentions analysis per operation base
Detentions per operator
Ports with more than 10 detentions
Detainable deficiency categories breakdown (All ships)
